GOOSE BAY REMEDIATION

$37M CAD, GOOSE BAY REMEDIATION, NEWFOUNDLAND AND LABRADOR

From 2013 to 2019, the team performed five consecutive projects under the Goose Bay Remediation Project, which serves as one of the largest environmental clean-ups undertaken by the Department of National Defence. This multi-year project involved the remediation of approximately 650,000 metric tonnes of petroleum hydrocarbon-contaminated soil and liquid petroleum hydrocarbon-impacted soil via ex-situ methods from several former tank farm sites at 5 Wing Goose Bay. Techniques used for remediation were primarily ex-situ bioremediation, with contingency applications such as ex-situ chemical oxidation both as a batch process and a continuous method via a process plant. This project is located in a remote northern location and the multi-year program was successfully completed on schedule, with most of the impacted soil treated and re-instated at the sites.